BC / ADBCE / CE

1858 CE–1875 CE

London main drainage and Bazalgette’s sewer network

Agua e infraestructura hidráulica · Saneamiento urbano · Alcantarillado · Salud pública

After the sanitary and political crisis of 1858, the Metropolitan Board of Works implemented Joseph Bazalgette’s interceptor-sewer system. The network moved wastewater away from central London and its main works were completed in 1875. This entry records a material and institutional response; it does not replace John Snow’s epidemiological investigation or assign every health outcome to one project.

Precision, calendar, and review
Start
year · no uncertainty qualifier in this record
End
year · no uncertainty qualifier in this record
Calendar and convention
Historical-era years; the source calendar is not identified. No conversion of days is assumed.
Year zero
The scale goes from 1 BCE to 1 CE without year zero. Changing era names changes labels only.
Documentary review
Date not recorded

Reading the date: duration of a process.

Sources

  1. oac.cdlib.org (opens in a new tab)
    Source provenance and scope
    Publication date
    Not identified in metadata; document review pending
    Bibliographic date checked
    2026-09-23

    The correspondence between this reference and individual claims has not yet been itemized.

This record is an editorial synthesis. Consult the sources to check claims and their limits. Chronological relationships alone do not establish causation.

Cite this record