Electricity grids as a transition bottleneck
Energy · Technology · Infrastructure
The IEA’s 2023 global assessment placed grid expansion, modernisation, regulation, and planning at the centre of electricity security. Electrification and new renewable projects require lines, connections, controls, and flexibility that do not always advance at the same pace. It is an infrastructure-and-governance diagnosis, not a claim that every grid or renewable project is necessarily blocked.
Precision, calendar, and review
- Start
- year · no uncertainty qualifier in this record
- Calendar and convention
- Historical-era years; the source calendar is not identified. No conversion of days is assumed.
- Year zero
- The scale goes from 1 BCE to 1 CE without year zero. Changing era names changes labels only.
- Documentary review
- Date not recorded
Reading the date: point event.
Sources
- www.iea.org (opens in a new tab)
Source provenance and scope
- Publication date
- Pending verification: the source could not be accessed
- Bibliographic date checked
- 2026-09-23
The correspondence between this reference and individual claims has not yet been itemized.
This record is an editorial synthesis. Consult the sources to check claims and their limits. Chronological relationships alone do not establish causation.